default search action
Leyuan Shi
Person information
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j56]Yilan Shen, Nianmin Zhang, Xi Zhang, Leyuan Shi:
Simultaneous Production Scheduling and Maintenance in Multi-Stage Production Systems: A Synergic Approach. IEEE Trans Autom. Sci. Eng. 21(3): 3787-3800 (2024) - 2023
- [j55]Weihao Wang, Chutong Gao, Leyuan Shi:
Robust Optimization on Unrelated Parallel Machine Scheduling With Setup Times. IEEE Trans Autom. Sci. Eng. 20(1): 346-360 (2023) - [c49]Chaoran Wang, Leyuan Shi:
A New Method for Human-Machine Ratio Configuration Scheduling Problem. CASE 2023: 1-6 - [c48]Jiaxi Wu, Ye Liang, Leyuan Shi:
A Lower Bound Guided Hierarchical Approach for a Two-Stage Scheduling Problem. CASE 2023: 1-6 - 2022
- [j54]Zhongshun Shi, Yijie Peng, Leyuan Shi, Chun-Hung Chen, Michael C. Fu:
Dynamic Sampling Allocation Under Finite Simulation Budget for Feasibility Determination. INFORMS J. Comput. 34(1): 557-568 (2022) - [j53]Yilan Shen, Xi Zhang, Leyuan Shi:
Joint optimization of production and maintenance for a serial-parallel hybrid two-stage production system. Reliab. Eng. Syst. Saf. 226: 108600 (2022) - [j52]Lingxuan Liu, Leyuan Shi:
Automatic Design of Efficient Heuristics for Two-Stage Hybrid Flow Shop Scheduling. Symmetry 14(4): 632 (2022) - [c47]Chaoran Wang, Leyuan Shi:
A New Nested Partition Algorithm for Parallel Machine Scheduling Problem with hard Q-Times and Setup Times. CASE 2022: 2087-2092 - 2021
- [j51]Jiaxi Wu, Yongkang Ding, Leyuan Shi:
Mathematical modeling and heuristic approaches for a multi-stage car sequencing problem. Comput. Ind. Eng. 152: 107008 (2021) - [j50]Ming Qin, Runsen Wang, Zhongshun Shi, Lingxuan Liu, Leyuan Shi:
A Genetic Programming-Based Scheduling Approach for Hybrid Flow Shop With a Batch Processor and Waiting Time Constraint. IEEE Trans Autom. Sci. Eng. 18(1): 94-105 (2021) - [j49]Weihao Wang, Chutong Gao, Leyuan Shi:
Workload Balancing for Production Planning With Lot Streaming and Multilevel BOM. IEEE Trans Autom. Sci. Eng. 18(1): 255-268 (2021) - [j48]Ming Qin, Zhongshun Shi, Weiwei Chen, Siyang Gao, Leyuan Shi:
Wafer Defect Inspection Optimization With Partial Coverage - A Numerical Approach. IEEE Trans Autom. Sci. Eng. 18(4): 1916-1927 (2021) - [c46]Jiaxi Wu, Wei Jiang, Leyuan Shi:
A harmony search based algorithm for a stochastic two-sided assembly line balancing problem. CASE 2021: 606-611 - 2020
- [c45]Xuedong Zhu, Weihao Wang, Xinxing Guo, Leyuan Shi:
A Genetic Programming-Based Evolutionary Approach for Flexible Job Shop Scheduling with Multiple Process Plans. CASE 2020: 49-54 - [c44]Runsen Wang, Yilan Shen, Weihao Wang, Leyuan Shi:
Formulation and Methods for a Class of Two-stage Flow-shop Scheduling Problem with the Batch Processor. CASE 2020: 728-733
2010 – 2019
- 2019
- [j47]Lingxuan Liu, Leyuan Shi:
Simulation Optimization on Complex Job Shop Scheduling with Non-Identical Job Sizes. Asia Pac. J. Oper. Res. 36(5): 1950026:1-1950026:26 (2019) - [j46]Zewen Huang, Zhongshun Shi, Leyuan Shi:
Minimising total weighted completion time on batch and unary machines with incompatible job families. Int. J. Prod. Res. 57(2): 567-581 (2019) - [j45]Weihao Wang, Zhongshun Shi, Leyuan Shi, Qingbin Zhao:
Integrated optimisation on flow-shop production with cutting stock. Int. J. Prod. Res. 57(19): 5996-6012 (2019) - [c43]Lingxuan Liu, Hongyu He, Leyuan Shi:
A new solution approach for flow shop scheduling with an exponential time-dependent learning effect. CASE 2019: 468-473 - [c42]Weihao Wang, Leyuan Shi:
Multi-level Lot-streaming Production Planning with the Objective of Workload Balancing. CASE 2019: 685-690 - [c41]Zhongshun Shi, Siyang Gao, Jianzhong Du, Hang Ma, Leyuan Shi:
Automatic Design of Dispatching Rules for Real-time optimization of Complex Production Systems*. SII 2019: 55-60 - 2018
- [j44]Siyang Gao, Leyuan Shi, Zhengjun Zhang:
A peak-over-threshold search method for global optimization. Autom. 89: 83-91 (2018) - [j43]Zhongshun Shi, Zewen Huang, Leyuan Shi:
Customer order scheduling on batch processing machines with incompatible job families. Int. J. Prod. Res. 56(1-2): 795-808 (2018) - 2017
- [j42]Zewen Huang, Zhongshun Shi, Cheng Zhang, Leyuan Shi:
A Note on "Two new approaches for a two-stage hybrid flowshop problem with a single batch processing machine under waiting time constraint". Comput. Ind. Eng. 110: 590-593 (2017) - [j41]Cheng Zhang, Zhongshun Shi, Zewen Huang, Yifan Wu, Leyuan Shi:
Flow shop scheduling with a batch processor and limited buffer. Int. J. Prod. Res. 55(11): 3217-3233 (2017) - [j40]Siyang Gao, Weiwei Chen, Leyuan Shi:
A New Budget Allocation Framework for the Expected Opportunity Cost. Oper. Res. 65(3): 787-803 (2017) - [j39]Siyang Gao, Loo Hay Lee, Chun-Hung Chen, Leyuan Shi:
A Sequential Budget Allocation Framework for Simulation Optimization. IEEE Trans Autom. Sci. Eng. 14(2): 1185-1194 (2017) - [j38]Zhongshun Shi, Longfei Wang, Pai Liu, Leyuan Shi:
Minimizing Completion Time for Order Scheduling: Formulation and Heuristic Algorithm. IEEE Trans Autom. Sci. Eng. 14(4): 1558-1569 (2017) - 2016
- [j37]Zhaoxia Guo, Dongqing Zhang, Sunney Yung-Sun Leung, Leyuan Shi:
A bi-level evolutionary optimization approach for integrated production and transportation scheduling. Appl. Soft Comput. 42: 215-228 (2016) - [j36]Defu Zhang, Leyuan Shi, Stephen C. H. Leung, Tao Wu:
A priority heuristic for the guillotine rectangular packing problem. Inf. Process. Lett. 116(1): 15-21 (2016) - [j35]Siyang Gao, Robert R. Meyer, Warren D. D'Souza, Leyuan Shi, Hao Howard Zhang:
A machine learning-based nested partitions framework for angle selection in radiotherapy. Optim. Methods Softw. 31(6): 1169-1188 (2016) - [c40]Zhongshun Shi, Zewen Huang, Leyuan Shi:
Two-stage flow shop with a batch processor and limited buffer. CASE 2016: 395-400 - [c39]Xiufeng Shao, Leyuan Shi:
Enhancing feasibility determination with kriging metamodels. CASE 2016: 476-481 - [c38]Zewen Huang, Jinxiang Ding, Jie Song, Leyuan Shi, Chun-Hung Chen:
Simulation optimization for the MRO scheduling problem based on multi-fidelity models. ICIT 2016: 1556-1561 - [c37]Jingsi Huang, Lingyan Liu, Leyuan Shi:
Auction policy analysis: An agent-based simulation optimization model of grain market. WSC 2016: 3417-3428 - 2015
- [j34]Longfei Wang, Jie Song, Leyuan Shi:
Dynamic emergency logistics planning: models and heuristic algorithm. Optim. Lett. 9(8): 1533-1552 (2015) - [j33]Siyang Gao, Leyuan Shi:
Selecting the Best Simulated Design With the Expected Opportunity Cost Bound. IEEE Trans. Autom. Control. 60(10): 2785-2790 (2015) - [j32]Jie Song, Zhongshun Shi, Bofei Sun, Leyuan Shi:
Treatment Planning for Volumetric-Modulated Arc Therapy: Model and Heuristic Algorithms. IEEE Trans Autom. Sci. Eng. 12(1): 116-126 (2015) - [c36]Zhongshun Shi, Pai Liu, Hongqiang Gao, Leyuan Shi:
Production planning for a class of batch processing problem. CASE 2015: 1188-1193 - 2014
- [j31]Weiwei Chen, Siyang Gao, Chun-Hung Chen, Leyuan Shi:
An Optimal Sample Allocation Strategy for Partition-Based Random Search. IEEE Trans Autom. Sci. Eng. 11(1): 177-186 (2014) - [c35]Zhongshun Shi, Longfei Wang, Leyuan Shi:
Approximation method to rank-one binary matrix factorization. CASE 2014: 800-805 - [c34]Siyang Gao, Leyuan Shi:
An optimal opportunity cost selection procedure for a fixed number of designs. WSC 2014: 3952-3958 - 2013
- [j30]Weiwei Chen, Jie Song, Leyuan Shi, Liang Pi, Peter Sun:
Data mining-based dispatching system for solving the local pickup and delivery problem. Ann. Oper. Res. 203(1): 351-370 (2013) - [j29]Tao Wu, Kerem Akartunali, Jie Song, Leyuan Shi:
Mixed integer programming in production planning with backlogging and setup carryover: modeling and algorithms. Discret. Event Dyn. Syst. 23(2): 211-239 (2013) - [c33]Bofei Sun, Jie Song, Guangying Zhu, Leyuan Shi:
A two-stage approach for VMAT treatment plan optimization. CASE 2013: 455-460 - [c32]Siyang Gao, Xi Zhang, Leyuan Shi:
Evaluation of improvement probability for IMRT plans. CASE 2013: 474-479 - [c31]Longfei Wang, Zhongshun Shi, Leyuan Shi:
A novel quadratic formulation for customer order scheduling problem. CASE 2013: 576-580 - [c30]Bofei Sun, Zhongshun Shi, Jie Song, Guangying Zhu, Leyuan Shi:
A linearized model and nested-partitions heuristics for VMAT radiation treatment planning optimization. CASE 2013: 629-633 - [c29]Bofei Sun, Jie Song, Leyuan Shi:
Integrated operating room scheduling optimization under particularly workload constrain of surgeon. CASE 2013: 972-977 - 2012
- [j28]Tao Wu, Leyuan Shi, Jie Song:
An MIP-based interval heuristic for the capacitated multi-level lot-sizing problem with setup times. Ann. Oper. Res. 196(1): 635-650 (2012) - [j27]Tao Wu, Leyuan Shi, Joseph Geunes, Kerem Akartunali:
On the equivalence of strong formulations for capacitated multi-level lot sizing problems with setup times. J. Glob. Optim. 53(4): 615-639 (2012) - [c28]Steven Hoerning, Jie Song, Tao Wu, Leyuan Shi:
Improving discrete event simulation in the emergency department with innovative and robust input analysis tools. CASE 2012: 131-136 - 2011
- [j26]Tao Wu, Leyuan Shi, Joseph Geunes, Kerem Akartunali:
An optimization framework for solving capacitated multi-level lot-sizing problems with backlogging. Eur. J. Oper. Res. 214(2): 428-441 (2011) - [j25]Weiwei Chen, Liang Pi, Leyuan Shi:
An Enhanced Nested Partitions Algorithm Using Solution Value Prediction. IEEE Trans Autom. Sci. Eng. 8(2): 412-419 (2011) - [j24]Yunjun Han, Xiaohong Guan, Leyuan Shi:
Optimization Based Method for Supply Location Selection and Routing in Large-Scale Emergency Material Delivery. IEEE Trans Autom. Sci. Eng. 8(4): 683-693 (2011) - [c27]Tao Wu, Leyuan Shi:
A lower and upper bound guided nested partitions method for solving capacitated multi-level production planning problems. CASE 2011: 78-83 - [c26]Weiwei Chen, Jie Song, Leyuan Shi:
Optimizing local pickup and delivery with uncertain loads. WSC 2011: 4251-4261 - 2010
- [j23]Canrong Zhang, Li Zheng, Zhi-Hai Zhang, Leyuan Shi, Aaron J. Armstrong:
The allocation of berths and quay cranes by using a sub-gradient optimization technique. Comput. Ind. Eng. 58(1): 40-50 (2010) - [j22]Canrong Zhang, Weiwei Chen, Leyuan Shi, Li Zheng:
A note on deriving decision rules to locate export containers in container yards. Eur. J. Oper. Res. 205(2): 483-485 (2010) - [j21]Tao Wu, Leyuan Shi, Neil A. Duffie:
An HNP-MP Approach for the Capacitated Multi-Item Lot Sizing Problem With Setup Times. IEEE Trans Autom. Sci. Eng. 7(3): 500-511 (2010) - [j20]Neil A. Duffie, Leyuan Shi:
Dynamics of WIP Regulation in Large Production Networks of Autonomous Work Systems. IEEE Trans Autom. Sci. Eng. 7(3): 665-670 (2010)
2000 – 2009
- 2009
- [j19]Hoksung Yau, Leyuan Shi:
Nested partitions for the large-scale extended job shop scheduling problem. Ann. Oper. Res. 168(1): 23-39 (2009) - [j18]Hao Howard Zhang, Leyuan Shi, Robert R. Meyer, Daryl Nazareth, Warren D. D'Souza:
Solving Beam-Angle Selection and Dose Optimization Simultaneously via High-Throughput Computing. INFORMS J. Comput. 21(3): 427-444 (2009) - [c25]Tao Wu, Leyuan Shi:
A new heuristic method for capacitated multi-level lot sizing problem with backlogging. CASE 2009: 483-488 - [c24]Hao Howard Zhang, Leyuan Shi, Robert R. Meyer, Warren D. D'Souza:
Machine Learning for Modeling Dose-Related Organ-at-Risk Complications after Radiation Therapy. ICMLA 2009: 457-462 - [c23]Tao Wu, Leyuan Shi:
Hybrid nested Partitions And Relax-And-Fix approach for capacitated multi-item lot sizing problem. SOLI 2009: 359-364 - [r1]Leyuan Shi, Sigurdur Ólafsson:
Nested Partitions Optimization. Encyclopedia of Optimization 2009: 2533-2539 - 2008
- [j17]Yunpeng Pan, Leyuan Shi:
New Hybrid Optimization Algorithms for Machine Scheduling Problems. IEEE Trans Autom. Sci. Eng. 5(2): 337-348 (2008) - [j16]Hoksung Yau, Yunpeng Pan, Leyuan Shi:
New Solution Approaches to the General Single- Machine Earliness-Tardiness Problem. IEEE Trans Autom. Sci. Eng. 5(2): 349-360 (2008) - [j15]Liang Pi, Yunpeng Pan, Leyuan Shi:
Hybrid Nested Partitions and Mathematical Programming Approach and Its Applications. IEEE Trans Autom. Sci. Eng. 5(4): 573-586 (2008) - [c22]Weiwei Chen, Leyuan Shi:
A variant of examination timetabling problem. CASE 2008: 353-358 - [c21]Gonzalo Argote-Garcia, Peter J. Clarke, Xudong He, Yujian Fu, Leyuan Shi:
A Formal Approach for Translating a SAM Architecture to PROMELA. SEKE 2008: 440-447 - [c20]Michael C. Fu, Chun-Hung Chen, Leyuan Shi:
Some topics for simulation optimization. WSC 2008: 27-38 - [c19]Tao Wu, Leyuan Shi, Benjamin Quirt, Neil A. Duffie:
Integrated dynamic and simulation model on coupled closed-loop workstation capacity controls in a multi-workstation production system. WSC 2008: 1946-1951 - 2007
- [j14]Yunpeng Pan, Leyuan Shi:
On the equivalence of the max-min transportation lower bound and the time-indexed lower bound for single-machine scheduling problems. Math. Program. 110(3): 543-559 (2007) - [c18]Liang Pi, Leyuan Shi:
Resource-Task Assignment Process with Rejections and Reassignments. CASE 2007: 448-453 - [c17]Yunjun Han, Xiaohong Guan, Leyuan Shi:
Optimal Supply Location Selection and Routing for Emergency Material Delivery. CASE 2007: 1039-1044 - [c16]Yujian Fu, Zhijiang Dong, Gonzalo Argote-Garcia, Leyuan Shi, Xudong He:
An Approach to Validating Translation Correctness From SAM to Java. SEKE 2007: 45- - 2006
- [j13]Yunpeng Pan, Leyuan Shi:
Branch-and-bound algorithms for solving hard instances of the one-machine sequencing problem. Eur. J. Oper. Res. 168(3): 1030-1039 (2006) - [c15]Liang Pi, Yunpeng Pan, Leyuan Shi:
Nested Partitions Method for the Local Pickup and Delivery Problem. CASE 2006: 375-380 - 2005
- [j12]Heng Liang, Fengshan Bai, Leyuan Shi:
Computing the optimal partition of variables in multi-homogeneous homotopy methods. Appl. Math. Comput. 163(2): 825-840 (2005) - [j11]Leyuan Shi, Yunpeng Pan:
An efficient search method for job-shop scheduling problems. IEEE Trans Autom. Sci. Eng. 2(1): 73-77 (2005) - [j10]Yunpeng Pan, Leyuan Shi:
Dual constrained single machine sequencing to minimize total weighted completion time. IEEE Trans Autom. Sci. Eng. 2(4): 344-357 (2005) - [c14]Yunpeng Pan, Leyuan Shi, Hoksung Yau:
A new optimization approach to the general single machine earliness-tardiness problem. CASE 2005: 43-48 - 2004
- [c13]Yunpeng Pan, Leyuan Shi:
On the optimal solution of the general min-max sequencing problem. CDC 2004: 3189-3190 - [c12]Yunpeng Pan, Leyuan Shi:
A Stochastic On-Line Model for Shipment Date Quoting with On-Time Delivery Guarantees. WSC 2004: 1195-1200 - 2002
- [j9]Bor-Ruey Fu, Leyuan Shi, Rajan Suri:
Analysis of Departure Times in Discrete and Continuous Tandem Production Lines. Discret. Event Dyn. Syst. 12(2): 159-186 (2002) - [j8]Sigurdur Ólafsson, Leyuan Shi:
Ordinal Comparison via the Nested Partitions Method. Discret. Event Dyn. Syst. 12(2): 211-239 (2002) - [c11]Harriet Black Nembhard, Leyuan Shi, Mehmet Aktan:
Financial derivatives and real options: effect of implementation time on real options valuation. WSC 2002: 1600-1605 - 2001
- [j7]Leyuan Shi, Sigurdur Ólafsson, Qun Chen:
An Optimization Framework for Product Design. Manag. Sci. 47(12): 1681-1692 (2001) - [c10]Harriet Black Nembhard, Leyuan Shi, Mehmet Aktan:
Supply chain modeling: a real options design for product outsourcing. WSC 2001: 548-552 - 2000
- [j6]Leyuan Shi:
A New Algorithm for Stochastic Discrete Resource Allocation Optimization. Discret. Event Dyn. Syst. 10(3): 271-294 (2000) - [j5]Leyuan Shi, Sigurdur Ólafsson:
Nested Partitions Method for Global Optimization. Oper. Res. 48(3): 390-407 (2000) - [c9]Harriet Black Nembhard, Leyuan Shi, Mehmet Aktan:
A real options design for quality control charts. WSC 2000: 597-603
1990 – 1999
- 1999
- [j4]Leyuan Shi, Sigurdur Ólafsson, Ning Sun:
New parallel randomized algorithms for the traveling salesman problem. Comput. Oper. Res. 26(4): 371-394 (1999) - [j3]Leyuan Shi, Bor-Ruey Fu, Rajan Suri:
Sample Path Analysis for Continuous Tandem Production Lines. Discret. Event Dyn. Syst. 9(3): 211-239 (1999) - [c8]Leyuan Shi, Chun-Hung Chen, Enver Yücesan:
Simultaneous simulation experiments and nested partition for discrete resource allocation in supply chain management. WSC 1999: 395-401 - [c7]Sigurdur Ólafsson, Leyuan Shi:
Optimization via adaptive sampling and regenerative simulation. WSC 1999: 666-672 - 1998
- [c6]Sigurdur Ólafsson, Leyuan Shi:
Stopping Criterion for a Simulation-Based Optimization Method. WSC 1998: 743-750 - 1997
- [c5]Leyuan Shi, Phillip Q. Hwang:
A method for real-time scheduling problems. WORDS 1997: 172-176 - [c4]Leyuan Shi, Sigurdur Ólafsson:
An Integrated Framework for Deterministic and Stochastic Optimization. WSC 1997: 358-365 - 1996
- [j2]Leyuan Shi:
Discontinuous perturbation analysis of discrete-event dynamic systems. IEEE Trans. Autom. Control. 41(11): 1676-1681 (1996) - [c3]Leyuan Shi, Phillip Q. Hwang:
Design and optimization of complex real-time dependable systems. WORDS 1996: 218-224 - [c2]Leyuan Shi:
Variance Property of Discontinuous Perturbation Analysis. WSC 1996: 412-417 - 1993
- [c1]Michael C. Fu, Jian-Qiang Hu, Leyuan Shi:
An application of perturbation analysis to a replacement problem in maintenance theory. WSC 1993: 329-337 - 1992
- [j1]Yu-Chi Ho, Leyuan Shi, Liyi Dai, Wei-Bo Gong:
Optimizing discrete event dynamic systems via the gradient surface method. Discret. Event Dyn. Syst. 2(2): 99-120 (1992)
Coauthor Index
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-10-07 22:08 CEST by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint