default search action
Feng Chu 0001
Person information
- affiliation: University of Evry, France
- affiliation: University of Paris-Saclay, France
- affiliation (former): Technical University Troyes, France
- affiliation (PhD 1995): University of Metz, France
- affiliation (former): National Polytechnic Institute of Lorraine, France
Other persons with the same name
- Feng Chu 0002 — Nanyang Technological University, School of Electrical and Electronic Engineering, Singapore
- Feng Chu 0003 — Southeast University, School of Electronic Science and Engineering, Nanjing, China
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j132]Ming Liu, Hao Tang, Feng Chu, Yueyu Ding, Feifeng Zheng, Chengbin Chu:
A signomial programming-based approach for multi-echelon supply chain disruption risk assessment with robust dynamic Bayesian network. Comput. Oper. Res. 161: 106422 (2024) - [j131]Ada Che, Jing Li, Feng Chu, Chengbin Chu:
Optimizing emergency supply pre-positioning for disaster relief: A two-stage distributionally robust approach. Comput. Oper. Res. 166: 106607 (2024) - [j130]Shijin Wang, Xiangning Li, Yihong Hu, Feng Chu:
A bay design problem in less-than-unit-load production warehouse. Comput. Oper. Res. 171: 106792 (2024) - [j129]Chengbin Chu, Feng Chu, Alexandre Dolgui, Rakesh Nagi, Xiaolan Xie:
Special issue in memory of Dr. Jean-Marie Proth (7.12.1938-17.06.2021). Int. J. Prod. Res. 62(1-2): 1-6 (2024) - [j128]Yunqiang Yin, Jie Wang, Feng Chu, Dujuan Wang:
Distributionally robust multi-period humanitarian relief network design integrating facility location, supply inventory and allocation, and evacuation planning. Int. J. Prod. Res. 62(1-2): 45-70 (2024) - [j127]Xinyue Wang, Tao Ren, Danyu Bai, Feng Chu, Yaodong Yu, Fanchun Meng, Chin-Chia Wu:
Scheduling a multi-agent flow shop with two scenarios and release dates. Int. J. Prod. Res. 62(1-2): 421-443 (2024) - [j126]Yipei Zhang, Feng Chu, Ada Che, Yantong Li:
Closed-loop inventory routing problem for perishable food with returnable transport items selection. Int. J. Prod. Res. 62(1-2): 501-521 (2024) - [j125]Ming Liu, Hao Tang, Feng Chu, Zhanguo Zhu, Chengbin Chu:
Food inspector scheduling with outcome and daily-schedule effects. Int. J. Prod. Res. 62(3): 737-766 (2024) - [j124]Tingting Chen, Feng Chu, Jiantong Zhang, Jiaqing Sun:
Sustainable collaborative strategy in pharmaceutical refrigerated logistics routing problem. Int. J. Prod. Res. 62(14): 5036-5060 (2024) - [j123]Jing Li, Feng Chu, Ada Che, Yunqiang Yin:
A Three-Stage Relief Network Design Approach for Predictable Disasters Considering Time-Dependent Uncertainty. IEEE Trans. Intell. Transp. Syst. 25(6): 5418-5434 (2024) - [j122]Xinyue Wang, Tao Ren, Danyu Bai, Feng Chu, Xinyu Lu, Zedong Weng, Jiang Li, Jie Liang:
Hybrid Flow Shop Scheduling With Learning Effects and Release Dates to Minimize the Makespan. IEEE Trans. Syst. Man Cybern. Syst. 54(1): 365-378 (2024) - 2023
- [j121]Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu:
An exact decomposition method for unrelated parallel machine scheduling with order acceptance and setup times. Comput. Ind. Eng. 175: 108899 (2023) - [j120]Shijin Wang, Hanyu Zhang, Feng Chu, Li Yu:
A relax-and-fix method for clothes inventory balancing scheduling problem. Int. J. Prod. Res. 61(20): 7085-7104 (2023) - [j119]Jun Wu, Yongxi Cheng, Zhen Yang, Feng Chu:
A 3/2-approximation algorithm for the multiple Hamiltonian path problem with no prefixed endpoints. Oper. Res. Lett. 51(5): 473-476 (2023) - [j118]Ming Liu, Tao Lin, Feng Chu, Feifeng Zheng, Chengbin Chu:
A new and general stochastic parallel machine ScheLoc problem with limited location capacity and customer credit risk. RAIRO Oper. Res. 57(3): 1179-1193 (2023) - [j117]Liping Gao, Chao Chen, Feng Chu, Chengwu Liao, Hongyu Huang, Yasha Wang:
MOOP: An Efficient Utility-Rich Route Planning Framework Over Two-Fold Time-Dependent Road Networks. IEEE Trans. Emerg. Top. Comput. Intell. 7(5): 1554-1570 (2023) - [c54]Ding Chen, Feng Chu, Lijun Tian:
Closed-loop food supply chain with returnable transport items and uncertain production capacity. ICNSC 2023: 1-6 - [c53]Ming Liu, Yueyu Ding, Feng Chu, Tao Lin, Chengbin Chu:
A Bi-objective Robust Dynamic Bayesian Network Method for Supply Chain Performance Evaluation. ICNSC 2023: 1-6 - [c52]Ming Liu, Yecheng Zhao, Feng Chu, Mengchu Zhou, Zhongzheng Liu:
Solving General Ranking and Selection Problems with Risk-aversion. ICNSC 2023: 1-6 - [c51]Xinyue Wang, Feng Chu, Tao Ren, Danyu Bai:
Minimizing the total electricity cost and maximum lateness of the flow shop scheduling problem under time-of-use energy tariffs. ICNSC 2023: 1-6 - [c50]Shijin Wang, Haoran Li, Feng Chu:
A Relax-and-fix Heuristic for Multiple Team Formation Problem. ICNSC 2023: 1-6 - [c49]Shijin Wang, Hanyu Zhang, Feng Chu, Kan Fang:
Simultaneous Production and Transportation Problem to Minimize the Total Cost of Waiting Time and Tardiness. ICNSC 2023: 1-6 - [c48]Xin Xu, Zhen Yang, Jun Wu, Feng Chu:
Optimizing Selection and Positioning of Single-Stage Rotor Blades. ICNSC 2023: 1-6 - [i1]Tingting Chen, Feng Chu, Jiantong Zhang, Jiaqing Sun:
Sustainable Collaborative Strategy in Pharmaceutical Refrigerated Logistics Routing Problem. CoRR abs/2311.04691 (2023) - 2022
- [j116]Ming Liu, Hao Tang, Feng Chu, Feifeng Zheng, Chengbin Chu:
Joint optimization of lot-sizing and pricing with backlogging. Comput. Ind. Eng. 167: 107979 (2022) - [j115]Shijin Wang, Ying Lu, Feng Chu, Jianbo Yu:
Scheduling with divisible jobs and subcontracting option. Comput. Oper. Res. 145: 105850 (2022) - [j114]Peng Hu, Feng Chu, Ming Liu, Shijin Wang, Peng Wu:
An integrated approach for a new flexible multi-product disassembly line balancing problem. Comput. Oper. Res. 148: 105932 (2022) - [j113]Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu:
Unrelated parallel machine scheduling problem with special controllable processing times and setups. Comput. Oper. Res. 148: 105990 (2022) - [j112]Yipei Zhang, Ada Che, Feng Chu:
Improved model and efficient method for bi-objective closed-loop food supply chain problem with returnable transport items. Int. J. Prod. Res. 60(3): 1051-1068 (2022) - [j111]Junkai He, Feng Chu, Alexandre Dolgui, Feifeng Zheng, Ming Liu:
Integrated stochastic disassembly line balancing and planning problem with machine specificity. Int. J. Prod. Res. 60(5): 1688-1708 (2022) - [j110]Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu, Ming Liu:
Distributionally robust and risk-averse optimisation for the stochastic multi-product disassembly line balancing problem with workforce assignment. Int. J. Prod. Res. 60(6): 1973-1991 (2022) - [j109]Jinpeng Xu, Yufei Huang, Emmanouil Avgerinos, Gengzhong Feng, Feng Chu:
Dual-channel competition: the role of quality improvement and price-matching. Int. J. Prod. Res. 60(12): 3705-3727 (2022) - [j108]Yunqiang Yin, Feng Chu, Alexandre Dolgui, T. C. E. Cheng, MengChu Zhou:
Big data analytics in production and distribution management. Int. J. Prod. Res. 60(22): 6682-6690 (2022) - [j107]Ming Liu, Zhongzheng Liu, Feng Chu, Rongfan Liu, Feifeng Zheng, Chengbin Chu:
Risk-averse assembly line worker assignment and balancing problem with limited temporary workers and moving workers. Int. J. Prod. Res. 60(23): 7074-7092 (2022) - [j106]Peng Wu, Ling Xu, Ada Che, Feng Chu:
A bi-objective decision model and method for the integrated optimization of bus line planning and lane reservation. J. Comb. Optim. 43(5): 1298-1327 (2022) - [j105]Peng Hu, Feng Chu, Yunfei Fang, Peng Wu:
Novel distribution-free model and method for stochastic disassembly line balancing with limited distributional information. J. Comb. Optim. 43(5): 1423-1446 (2022) - [j104]E. Zhang, Feng Chu, Shijin Wang, Ming Liu, Yang Sui:
Approximation approach for robust vessel fleet deployment problem with ambiguous demands. J. Comb. Optim. 44(4): 2180-2194 (2022) - [j103]Jingshan Li, Jie Song, Yan Li, Xiang Zhong, Feng Chu, Jingang Yi:
Guest Editorial Special Issue on Challenges and Responses of Automation Science and Engineering to the COVID-19 Pandemic. IEEE Trans Autom. Sci. Eng. 19(2): 555-559 (2022) - [j102]Ying Li, Feng Chu, Feifeng Zheng, Ming Liu:
A Bi-Objective Optimization for Integrated Berth Allocation and Quay Crane Assignment With Preventive Maintenance Activities. IEEE Trans. Intell. Transp. Syst. 23(4): 2938-2955 (2022) - [j101]Peng Wu, Feng Chu, Nasreddine Saidani, Haoxun Chen, MengChu Zhou:
Optimizing Locations and Qualities of Multiple Facilities With Competition via Intelligent Search. IEEE Trans. Intell. Transp. Syst. 23(6): 5092-5105 (2022) - [j100]Shijin Wang, Feng Chu:
A Decomposition-Based Heuristic Method for Inventory Routing Problem. IEEE Trans. Intell. Transp. Syst. 23(10): 18352-18360 (2022) - [c47]Junheng Cheng, Jingya Cheng, Feng Chu:
Bi-Objective Optimization for Uniform Parallel Batch Machine Scheduling under Time-of-Use Tariffs. ICNSC 2022: 1-6 - [c46]Ming Liu, Yueyu Ding, Feng Chu, Chengbin Chu:
Robust Optimization for the Risk Mitigation of Hazardous Material Road Transportation System. ITSC 2022: 773-778 - 2021
- [j99]Junkai He, Feng Chu, Feifeng Zheng, Ming Liu:
A green-oriented bi-objective disassembly line balancing problem with stochastic task processing times. Ann. Oper. Res. 296(1): 71-93 (2021) - [j98]Xiaoyi Man, Feifeng Zheng, Feng Chu, Ming Liu, Yinfeng Xu:
Bi-objective optimization for a two-depot automated storage/retrieval system. Ann. Oper. Res. 296(1): 243-262 (2021) - [j97]Peng Wu, Junheng Cheng, Feng Chu:
Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristics. Ann. Oper. Res. 296(1): 471-494 (2021) - [j96]Rongfan Liu, Ming Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
Eco-friendly multi-skilled worker assignment and assembly line balancing problem. Comput. Ind. Eng. 151: 106944 (2021) - [j95]Pengyu Yan, Xiaoqiang Cai, Debing Ni, Feng Chu, Heng He:
Two-stage matching-and-scheduling algorithm for real-time private parking-sharing programs. Comput. Oper. Res. 125: 105083 (2021) - [j94]Kan Fang, Shijin Wang, Michael L. Pinedo, Lin Chen, Feng Chu:
A combinatorial Benders decomposition algorithm for parallel machine scheduling with working-time restrictions. Eur. J. Oper. Res. 291(1): 128-146 (2021) - [j93]Ming Liu, Zhongzheng Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
A new robust dynamic Bayesian network approach for disruption risk assessment under the supply chain ripple effect. Int. J. Prod. Res. 59(1): 265-285 (2021) - [j92]Ming Liu, Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
An exact method for disassembly line balancing problem with limited distributional information. Int. J. Prod. Res. 59(3): 665-682 (2021) - [j91]Xin Liu, Feng Chu, Alexandre Dolgui, Feifeng Zheng, Ming Liu:
Service-oriented bi-objective robust collection-disassembly problem with equipment selection. Int. J. Prod. Res. 59(6): 1676-1690 (2021) - [j90]Xin Feng, Feng Chu, Chengbin Chu, Yufei Huang:
Crowdsource-enabled integrated production and transportation scheduling for smart city logistics. Int. J. Prod. Res. 59(7): 2157-2176 (2021) - [j89]Ming Liu, Xin Liu, Feng Chu, E. Zhang, Chengbin Chu:
Service-oriented robust worker scheduling with motivation effects. Int. J. Prod. Res. 59(8): 2328-2351 (2021) - [j88]Shijin Wang, Wenli Cui, Feng Chu, Jianbo Yu:
The interval min-max regret knapsack packing-delivery problem. Int. J. Prod. Res. 59(18): 5661-5677 (2021) - [j87]Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu, Ming Liu:
Parallel machine scheduling with stochastic release times and processing times. Int. J. Prod. Res. 59(20): 6327-6346 (2021) - [j86]Peng Wu, Cheng-Hu Yang, Feng Chu, MengChu Zhou, Khaled Sedraoui, Fahad S. Al Sokhiry:
Cost-Profit Trade-Off for Optimally Locating Automotive Service Firms Under Uncertainty. IEEE Trans. Intell. Transp. Syst. 22(2): 1014-1025 (2021) - [c45]Feifeng Zheng, Zhaojie Wang, Ming Liu, Yinfeng Xu, Feng Chu:
Theoretical Results on Single Machine Scheduling to Minimize the Number of Tardy Jobs with Periodic Maintenance. ICNSC 2021: 1-6 - [c44]Ming Liu, Yueyu Ding, Feng Chu, Feifeng Zheng, Chengbin Chu:
Electric Bus Charging Scheduling Strategy with Stochastic Arrival Time and State of Charge. APMS (3) 2021: 241-249 - [c43]Ming Liu, Yecheng Zhao, Feng Chu, Feifeng Zheng, Chengbin Chu:
A Mathematical Model for Bus Scheduling with Conditional Signal Priority. APMS (3) 2021: 274-281 - [c42]Ming Liu, Hao Tang, Feng Chu, Feifeng Zheng, Chengbin Chu:
A Tabu Search Heuristic for the Robust Dynamic Bayesian Network Optimisation Problem Under the Supply Chain Ripple Effect. APMS (3) 2021: 673-680 - [c41]Ming Liu, Tao Lin, Feng Chu, Feifeng Zheng, Chengbin Chu:
A New Robust Dynamic Bayesian Network Model with Bounded Deviation Budget for Disruption Risk Evaluation. APMS (3) 2021: 681-688 - [c40]Ming Liu, Zhongzheng Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
Stochastic Integrated Supplier Selection and Disruption Risk Assessment Under Ripple Effect. APMS (3) 2021: 689-696 - 2020
- [j85]Ming Liu, Xin Liu, Feng Chu, Maoran Zhu, Feifeng Zheng:
Liner ship bunkering and sailing speed planning with uncertain demand. Comput. Appl. Math. 39(1) (2020) - [j84]Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu, Xin Liu:
An improved formulation and efficient heuristics for the discrete parallel-machine makespan ScheLoc problem. Comput. Ind. Eng. 140: 106238 (2020) - [j83]Shijin Wang, Wenli Cui, Feng Chu, Jianbo Yu, Jatinder N. D. Gupta:
Robust (min-max regret) single machine scheduling with interval processing times and total tardiness criterion. Comput. Ind. Eng. 149: 106838 (2020) - [j82]Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu:
Identical parallel machine scheduling with assurance of maximum waiting time for an emergency job. Comput. Oper. Res. 118: 104918 (2020) - [j81]Peng Wu, Feng Chu, Nasreddine Saidani, Haoxun Chen, Wei Zhou:
IoT-based location and quality decision-making in emerging shared parking facilities with competition. Decis. Support Syst. 134: 113301 (2020) - [j80]Shijin Wang, Xiaodong Wang, Feng Chu, Jianbo Yu:
An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production. Int. J. Prod. Res. 58(8): 2283-2314 (2020) - [j79]Ming Liu, Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
Profit-oriented distributionally robust chance constrained flowshop scheduling considering credit risk. Int. J. Prod. Res. 58(8): 2527-2549 (2020) - [j78]Junkai He, Feng Chu, Feifeng Zheng, Ming Liu, Chengbin Chu:
A multi-objective distribution-free model and method for stochastic disassembly line balancing problem. Int. J. Prod. Res. 58(18): 5721-5737 (2020) - [j77]Ming Liu, Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
Robust disassembly line balancing with ambiguous task processing times. Int. J. Prod. Res. 58(19): 5806-5835 (2020) - [j76]Shijin Wang, Ruochen Wu, Feng Chu, Jianbo Yu:
Variable neighborhood search-based methods for integrated hybrid flow shop scheduling with distribution. Soft Comput. 24(12): 8917-8936 (2020) - [j75]Peng Wu, Feng Chu, Ada Che, Yongxiang Zhao:
Dual-Objective Optimization for Lane Reservation With Residual Capacity and Budget Constraints. IEEE Trans. Syst. Man Cybern. Syst. 50(6): 2187-2197 (2020) - [c39]Lubing Wang, Peng Wu, Feng Chu:
A Multi-objective Emergency Scheduling Model for Forest Fires with Priority Areas. IEEM 2020: 610-614
2010 – 2019
- 2019
- [j74]Feng Chu, Junkai He, Feifeng Zheng, Ming Liu:
Scheduling multiple yard cranes in two adjacent container blocks with position-dependent processing times. Comput. Ind. Eng. 136: 355-365 (2019) - [j73]Ming Liu, Feng Chu, Junkai He, Dapeng Yang, Chengbin Chu:
Coke production scheduling problem: A parallel machine scheduling with batch preprocessings and location-dependent processing times. Comput. Oper. Res. 104: 37-48 (2019) - [j72]Yantong Li, Feng Chu, Chengbin Chu, Zhanguo Zhu:
An efficient three-level heuristic for the large-scaled multi-product production routing problem with outsourcing. Eur. J. Oper. Res. 272(3): 914-927 (2019) - [j71]Zhen Yang, Haoxun Chen, Feng Chu, Nengmin Wang:
An effective hybrid approach to the two-stage capacitated facility location problem. Eur. J. Oper. Res. 275(2): 467-480 (2019) - [j70]Ming Liu, Xin Liu, E. Zhang, Feng Chu, Chengbin Chu:
Scenario-based heuristic to two-stage stochastic program for the parallel machine ScheLoc problem. Int. J. Prod. Res. 57(6): 1706-1723 (2019) - [j69]Feifeng Zheng, Ying Li, Feng Chu, Ming Liu, Yinfeng Xu:
Integrated berth allocation and quay crane assignment with maintenance activities. Int. J. Prod. Res. 57(11): 3478-3503 (2019) - [j68]Ming Liu, Xin Liu, Feng Chu, Feifeng Zheng, Chengbin Chu:
Service-oriented robust parallel machine scheduling. Int. J. Prod. Res. 57(12): 3814-3830 (2019) - [j67]Feifeng Zheng, Xiaoyi Man, Feng Chu, Ming Liu, Chengbin Chu:
A two-stage stochastic programming for single yard crane scheduling with uncertain release times of retrieval tasks. Int. J. Prod. Res. 57(13): 4132-4147 (2019) - [j66]Ming Liu, Lijie An, Jiantong Zhang, Feng Chu, Chengbin Chu:
Energy-oriented bi-objective optimisation for a multi-module reconfigurable manufacturing system. Int. J. Prod. Res. 57(19): 5974-5995 (2019) - [j65]Yipei Zhang, Feng Chu, Ada Che, Yugang Yu, Xin Feng:
Novel model and kernel search heuristic for multi-period closed-loop food supply chain planning with returnable transport items. Int. J. Prod. Res. 57(23): 7439-7456 (2019) - [j64]Chenpeng Feng, Feng Chu, Nan Zhou, Gongbing Bi, Jing-Jing Ding:
Performance evaluation and quota allocation for multiple undesirable outputs based on the uniform frontier. J. Oper. Res. Soc. 70(3): 472-486 (2019) - [j63]Yantong Li, Feng Chu, Chenpeng Feng, Chengbin Chu, MengChu Zhou:
Integrated Production Inventory Routing Planning for Intelligent Food Logistics Systems. IEEE Trans. Intell. Transp. Syst. 20(3): 867-878 (2019) - [j62]Ming Liu, Bian Liang, Feifeng Zheng, Feng Chu:
Stochastic Airline Fleet Assignment With Risk Aversion. IEEE Trans. Intell. Transp. Syst. 20(8): 3081-3090 (2019) - 2018
- [j61]Shijin Wang, Zhanguo Zhu, Kan Fang, Feng Chu, Chengbin Chu:
Scheduling on a two-machine permutation flow shop under time-of-use electricity tariffs. Int. J. Prod. Res. 56(9): 3173-3187 (2018) - [j60]Zhanguo Zhu, Feng Chu, Alexandre Dolgui, Chengbin Chu, Wei Zhou, Selwyn Piramuthu:
Recent advances and opportunities in sustainable food supply chain: a model-oriented review. Int. J. Prod. Res. 56(17): 5700-5722 (2018) - [j59]Feifeng Zheng, Junkai He, Feng Chu, Ming Liu:
A new distribution-free model for disassembly line balancing problem with stochastic task processing times. Int. J. Prod. Res. 56(24): 7341-7353 (2018) - [j58]Feng Chu, Ming Liu, Xin Liu, Chengbin Chu, Juan Jiang:
Reentrant Flow Shop Scheduling considering Multiresource Qualification Matching. Sci. Program. 2018: 2615096:1-2615096:8 (2018) - [j57]Junheng Cheng, Feng Chu, Mengchu Zhou:
An Improved Model for Parallel Machine Scheduling Under Time-of-Use Electricity Price. IEEE Trans Autom. Sci. Eng. 15(2): 896-899 (2018) - [j56]Peng Wu, Feng Chu, Ada Che, MengChu Zhou:
Bi-Objective Scheduling of Fire Engines for Fighting Forest Fires: New Optimization Approaches. IEEE Trans. Intell. Transp. Syst. 19(4): 1140-1151 (2018) - [j55]Feifeng Zheng, Xiaoyi Man, Feng Chu, Ming Liu, Chengbin Chu:
Two Yard Crane Scheduling With Dynamic Processing Time and Interference. IEEE Trans. Intell. Transp. Syst. 19(12): 3775-3784 (2018) - [c38]Peng Wu, Feng Chu, Yunfei Fang, Cheng-Hu Yang:
Optimal lane reservation via new optimization model and heuristic algorithm. ICNSC 2018: 1-5 - [c37]Yunfei Fang, Xiaoyuan Wang, Peng Wu, Feng Chu, Zhen Zhou:
Model and solution for lane reservation problem with optimally grouping tasks. ICNSC 2018: 1-6 - [c36]Ming Liu, Rongfan Liu, Shijin Wang, Feng Chu, Chengbin Chu:
Container truck scheduling problem under empty container return policy. ICNSC 2018: 1-6 - [c35]Ming Liu, Bian Liang, Feifeng Zheng, Chengbin Chu, Feng Chu:
Quay crane scheduling problem with the consideration of maintenance. ICNSC 2018: 1-6 - 2017
- [j54]Peng Wu, Feng Chu, Ada Che, Yunfei Fang:
An efficient two-phase exact algorithm for the automated truck freight transportation problem. Comput. Ind. Eng. 110: 59-66 (2017) - [j53]Junheng Cheng, Feng Chu, Ming Liu, Peng Wu, Weili Xia:
Bi-criteria single-machine batch scheduling with machine on/off switching under time-of-use tariffs. Comput. Ind. Eng. 112: 721-734 (2017) - [j52]Wei Zhou, Selwyn Piramuthu, Feng Chu, Chengbin Chu:
RFID-enabled flexible warehousing. Decis. Support Syst. 98: 99-112 (2017) - [j51]Tingying Wu, Feng Chu, Zhen Yang, Zhili Zhou, Wei Zhou:
Lagrangean relaxation and hybrid simulated annealing tabu search procedure for a two-echelon capacitated facility location problem with plant size selection. Int. J. Prod. Res. 55(9): 2540-2555 (2017) - [j50]Peng Wu, Ada Che, Feng Chu, Yunfei Fang:
Exact and Heuristic Algorithms for Rapid and Station Arrival-Time Guaranteed Bus Transportation via Lane Reservation. IEEE Trans. Intell. Transp. Syst. 18(8): 2028-2043 (2017) - [c34]Ming Liu, Zhihui Sun, Xiaoning Zhang, Feng Chu:
A two-stage no-wait hybrid flow-shop model for the flight departure scheduling in a multi-airport system. ICNSC 2017: 495-500 - 2016
- [j49]Ming Liu, Shijin Wang, Feng Chu, Yinfeng Xu:
Some complexity results and an efficient algorithm for quay crane scheduling problem. Discret. Math. Algorithms Appl. 8(4): 1650058:1-1650058:19 (2016) - [j48]Junheng Cheng, Feng Chu, Chengbin Chu, Weili Xia:
Bi-objective optimization of single-machine batch scheduling under time-of-use electricity prices. RAIRO Oper. Res. 50(4-5): 715-732 (2016) - [j47]Zhanguo Zhu, Feng Chu, Yugang Yu, Linyan Sun:
Single-machine past-sequence-dependent setup times scheduling with resource allocation and learning effect. RAIRO Oper. Res. 50(4-5): 733-748 (2016) - [c33]Ming Liu, Lujun Xu, Chengbin Chu, Feng Chu:
Framework branch-and-price algorithm for yard management problem at container terminals. ICNSC 2016: 1-6 - [c32]Yantong Li, Feng Chu, Chengbin Chu, Wei Zhou, Zhanguo Zhu:
Integrated production inventory routing planning with time windows for perishable food. ITSC 2016: 2651-2656 - [c31]Junheng Cheng, Feng Chu, Ming Liu, Weili Xia:
Single-machine batch scheduling under time-of-use tariffs: New mixed-integer programming approaches. SMC 2016: 3498-3503 - 2015
- [j46]Yunfei Fang, Feng Chu, Saïd Mammar, Qin Shi:
A new cut-and-solve and cutting plane combined approach for the capacitated lane reservation problem. Comput. Ind. Eng. 80: 212-221 (2015) - [j45]Peng Wu, Ada Che, Feng Chu, MengChu Zhou:
An Improved Exact ε-Constraint and Cut-and-Solve Combined Method for Biobjective Robust Lane Reservation. IEEE Trans. Intell. Transp. Syst. 16(3): 1479-1492 (2015) - [j44]Ada Che, Peng Wu, Feng Chu, MengChu Zhou:
Improved Quantum-Inspired Evolutionary Algorithm for Large-Size Lane Reservation. IEEE Trans. Syst. Man Cybern. Syst. 45(12): 1535-1548 (2015) - [c30]Tingying Wu, Zhen Yang, Feng Chu, Zhili Zhou:
A lagrangean relaxation approach for a two-stage capacitated facility location problem with choice of depot size. ICNSC 2015: 39-44 - [c29]Yunfei Fang, Feng Chu, Zhibin Wu, Kejia Chen:
A tabu search based algorithm for optimal lane reservation. ICNSC 2015: 607-612 - [c28]Peng Wu, Feng Chu, Ada Che:
Mixed-integer Programming for a New Bus-lane Reservation Problem. ITSC 2015: 2782-2787 - [c27]Tingying Wu, Feng Chu, Zhen Yang, Zhili Zhou:
A Lagrangean Relaxation Approach for a Two-Stage Capacitated Facility Location Problem with Choice of Facility Size. SMC 2015: 713-718 - 2014
- [j43]Jinfeng Li, Feng Chu, Christian Prins, Zhanguo Zhu:
Lower and upper bounds for a two-stage capacitated facility location problem with handling costs. Eur. J. Oper. Res. 236(3): 957-967 (2014) - [j42]Gongbing Bi, Chenpeng Feng, Jing-Jing Ding, Liang Liang, Feng Chu:
The linear formulation of the ZSG-DEA models with different production technologies. J. Oper. Res. Soc. 65(8): 1202-1211 (2014) - [c26]Junheng Cheng, Feng Chu, Weili Xia, Jianxun Ding, Xiang Ling:
Bi-objective optimization for single-machine batch scheduling considering energy cost. CoDIT 2014: 236-241 - [c25]Peng Wu, Feng Chu, Ada Che, Qin Shi:
A bus lane reservation problem in urban bus transit network. ITSC 2014: 2864-2869 - 2013
- [j41]Chengbin Chu, Feng Chu, Jinhong Zhong, Shanling Yang:
A polynomial algorithm for a lot-sizing problem with backlogging, outsourcing and limited inventory. Comput. Ind. Eng. 64(1): 200-210 (2013) - [j40]Zhen Yang, Guoqing Wang, Feng Chu:
An effective GRASP and tabu search for the 0-1 quadratic knapsack problem. Comput. Oper. Res. 40(5): 1176-1185 (2013) - [j39]Zhen Zhou, Feng Chu, Ada Che, MengChu Zhou:
$\varepsilon$-Constraint and Fuzzy Logic-Based Optimization of Hazardous Material Transportation via Lane Reservation. IEEE Trans. Intell. Transp. Syst. 14(2): 847-857 (2013) - [j38]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Petri Net Modeling and Cycle-Time Analysis of Dual-Arm Cluster Tools With Wafer Revisiting. IEEE Trans. Syst. Man Cybern. Syst. 43(1): 196-207 (2013) - [j37]Naiqi Wu, MengChu Zhou, Feng Chu, Chengbin Chu:
A Petri-Net-Based Scheduling Strategy for Dual-Arm Cluster Tools With Wafer Revisiting. IEEE Trans. Syst. Man Cybern. Syst. 43(5): 1182-1194 (2013) - [c24]Peng Wu, Ada Che, Feng Chu:
A quantum evolutionary algorithm for lane reservation problem. ICNSC 2013: 264-268 - [c23]Yunfei Fang, Saïd Mammar, Feng Chu, Zhanguo Zhu:
A new model for lane reservation problem with time-dependent travel times. ICNSC 2013: 367-372 - [c22]Zhanguo Zhu, Ming Liu, Feng Chu, Yunfei Fang:
Single machine scheduling with past-sequence-dependent delivery times and learning effect. ICNSC 2013: 574-578 - 2012
- [j36]Yugang Yu, Chengbin Chu, Haoxun Chen, Feng Chu:
Large scale stochastic inventory routing problems with split delivery and service level constraints. Ann. Oper. Res. 197(1): 135-158 (2012) - [j35]Nasreddine Saidani, Feng Chu, Haoxun Chen:
Competitive facility location and design with reactions of competitors already in the market. Eur. J. Oper. Res. 219(1): 9-17 (2012) - [j34]Zhen Yang, Feng Chu, Haoxun Chen:
A cut-and-solve based algorithm for the single-source capacitated facility location problem. Eur. J. Oper. Res. 221(3): 521-532 (2012) - [j33]Yufei Huang, Feng Chu, Chengbin Chu, Yingluo Wang:
Determining the number of new employees with learning, forgetting and variable wage with a Newsvendor model in pull systems. J. Intell. Manuf. 23(1): 73-89 (2012) - [j32]Jinfeng Li, Christian Prins, Feng Chu:
A scatter search for a multi-type transshipment point location problem with multicommodity flow. J. Intell. Manuf. 23(4): 1103-1117 (2012) - [j31]Chengbin Chu, Feng Chu, MengChu Zhou, Haoxun Chen, Qingning Shen:
A Polynomial Dynamic Programming Algorithm for Crude Oil Transportation Planning. IEEE Trans Autom. Sci. Eng. 9(1): 42-55 (2012) - [j30]Yunfei Fang, Feng Chu, Saïd Mammar, MengChu Zhou:
Optimal Lane Reservation in Transportation Network. IEEE Trans. Intell. Transp. Syst. 13(2): 482-491 (2012) - [j29]Naiqi Wu, Liping Bai, MengChu Zhou, Feng Chu, Saïd Mammar:
A Novel Approach to Optimization of Refining Schedules for Crude Oil Operations in Refinery. IEEE Trans. Syst. Man Cybern. Part C 42(6): 1042-1053 (2012) - [c21]Zhen Zhou, Feng Chu, Ada Che, Saïd Mammar:
A multi-objective model for the hazardous materials transportation problem based on lane reservation. ICNSC 2012: 328-333 - [c20]Jinfeng Li, Changrui Ren, Bing Shao, Qinhua Wang, Miao He, Jin Dong, Feng Chu:
A solution for reallocating public bike among bike stations. ICNSC 2012: 352-355 - [c19]Sami Smaili, Dalil Ichalal, Feng Chu, Salim Mammar, Saïd Mammar:
Model predictive control for an urban trimodal model. ICNSC 2012: 356-361 - 2011
- [j28]Zhanguo Zhu, Linyan Sun, Feng Chu, Ming Liu:
Single-machine group scheduling with resource allocation and learning effect. Comput. Ind. Eng. 60(1): 148-157 (2011) - [j27]Jianxiang Li, Feng Chu, Haoxun Chen:
Coordination of split deliveries in one-warehouse multi-retailer distribution systems. Comput. Ind. Eng. 60(2): 291-301 (2011) - [j26]Zhen Yang, Haoxun Chen, Feng Chu:
A Lagrangian relaxation approach for a large scale new variant of capacitated clustering problem. Comput. Ind. Eng. 61(2): 430-435 (2011) - [j25]Qingning Shen, Feng Chu, Haoxun Chen:
A Lagrangian relaxation approach for a multi-mode inventory routing problem with transshipment in crude oil transportation. Comput. Chem. Eng. 35(10): 2113-2123 (2011) - [j24]Jianxiang Li, Feng Chu, Haoxun Chen:
A solution approach to the inventory routing problem in a three-level distribution system. Eur. J. Oper. Res. 210(3): 736-744 (2011) - [j23]Naiqi Wu, Feng Chu, Chengbin Chu, Mengchu Zhou:
Petri Net-Based Scheduling of Single-Arm Cluster Tools With Reentrant Atomic Layer Deposition Processes. IEEE Trans Autom. Sci. Eng. 8(1): 42-55 (2011) - [j22]Naiqi Wu, Chengbin Chu, Feng Chu, MengChu Zhou:
Schedulability Analysis of Short-Term Scheduling for Crude Oil Operations in Refinery With Oil Residency Time and Charging-Tank-Switch-Overlap Constraints. IEEE Trans Autom. Sci. Eng. 8(1): 190-204 (2011) - [j21]Naiqi Wu, Feng Chu, Saïd Mammar, MengChu Zhou:
Petri Net Modeling of the Cooperation Behavior of a Driver and a Copilot in an Advanced Driving Assistance System. IEEE Trans. Intell. Transp. Syst. 12(4): 977-989 (2011) - [c18]Naiqi Wu, Feng Chu, Saïd Mammar, MengChu Zhou:
Interaction behavior modeling of advanced driving assistance systems by using Petri net. ICNSC 2011: 145-150 - [c17]Yunfei Fang, Feng Chu, Saïd Mammar, Ada Che:
Iterative algorithm for lane reservation problem on transportation network. ICNSC 2011: 305-310 - [c16]Zhanguo Zhu, Feng Chu, Linyan Sun, Ming Liu:
Scheduling with resource allocation and past-sequence-dependent setup times including maintenance. ICNSC 2011: 383-387 - [c15]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Petri net-based cycle time analysis of dual-arm cluster tools with wafer revisiting and swapping strategy. ICRA 2011: 5499-5504 - 2010
- [j20]Feng Chu, Chengbin Chu, Caroline Desprez:
Series production in a basic re-entrant shop to minimize makespan or total flow time. Comput. Ind. Eng. 58(2): 257-268 (2010) - [j19]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Tank cycling and scheduling analysis of high fusion point oil transportation for crude oil operations in refinery. Comput. Chem. Eng. 34(4): 529-543 (2010) - [j18]Jianxiang Li, Haoxun Chen, Feng Chu:
Performance evaluation of distribution strategies for the inventory routing problem. Eur. J. Oper. Res. 202(2): 412-419 (2010) - [j17]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Hybrid Petri Net Modeling and Schedulability Analysis of High Fusion Point Oil Transportation Under Tank Grouping Strategy for Crude Oil Operations in Refinery. IEEE Trans. Syst. Man Cybern. Part C 40(2): 159-175 (2010)
2000 – 2009
- 2009
- [j16]Jinfeng Li, Feng Chu, Christian Prins:
Lower and upper bounds for a capacitated plant location problem with multicommodity flow. Comput. Oper. Res. 36(11): 3019-3030 (2009) - [j15]Yugang Yu, Feng Chu, Haoxun Chen:
A Stackelberg game and its improvement in a VMI system with a manufacturing vendor. Eur. J. Oper. Res. 192(3): 929-948 (2009) - [j14]Caroline Desprez, Feng Chu, Chengbin Chu:
Minimising the weighted number of tardy jobs in a hybrid flow shop with genetic algorithm. Int. J. Comput. Integr. Manuf. 22(8): 745-757 (2009) - [j13]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Short-Term Schedulability Analysis of Multiple Distiller Crude Oil Operations in Refinery With Oil Residency Time Constraint. IEEE Trans. Syst. Man Cybern. Part C 39(1): 1-16 (2009) - [c14]Yingfeng Wu, Chengbin Chu, Feng Chu, Naiqi Wu:
Heuristic for lane reservation problem in time constrained transportation. CASE 2009: 543-548 - [c13]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
A novel approach to scheduling of single-arm cluster tools with wafer revisiting. CASE 2009: 567-572 - 2008
- [j12]Yugang Yu, Haoxun Chen, Feng Chu:
A new model and hybrid approach for large scale inventory routing problems. Eur. J. Oper. Res. 189(3): 1022-1040 (2008) - [j11]Naiqi Wu, MengChu Zhou, Feng Chu:
A Petri Net-Based Heuristic Algorithm for Realizability of Target Refining Schedule for Oil Refinery. IEEE Trans Autom. Sci. Eng. 5(4): 661-676 (2008) - [j10]Feng Chu, Chengbin Chu:
Single-Item Dynamic Lot-Sizing Models With Bounded Inventory and Outsourcing. IEEE Trans. Syst. Man Cybern. Part A 38(1): 70-77 (2008) - [j9]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Short-Term Schedulability Analysis of Crude Oil Operations in Refinery With Oil Residency Time Constraint Using Petri Nets. IEEE Trans. Syst. Man Cybern. Part C 38(6): 765-778 (2008) - [c12]Naiqi Wu, MengChu Zhou, ShihSen Peng, Feng Chu, Chengbin Chu:
Petri net modeling and real-time control of dual-arm cluster tools with residency time constraint and activity time variations. CASE 2008: 109-114 - [c11]Feng Chu, Chengbin Chu, Qingning Shen, Haoxun Chen:
An O(T3) Polynomial algorithm for crude oil transportation. CASE 2008: 303-308 - [c10]Naiqi Wu, Chengbin Chu, Feng Chu, MengChu Zhou:
Modeling and Schedulability Analysis of Single-Arm Cluster Tools with Wafer Residency Time Constraints Using Petri Net. ICNSC 2008: 84-89 - [c9]Jianxiang Li, Haoxun Chen, Feng Chu:
Effectiveness evaluation on direct shipping strategy. SMC 2008: 1760-1764 - [c8]Naiqi Wu, Chengbin Chu, Feng Chu, MengChu Zhou:
Short-term schedulability analysis of crude oil operations in refinery with hybrid Petri net. SMC 2008: 1916-1921 - 2007
- [j8]Yugang Yu, Feng Chu, Haoxun Chen:
A note on coordination of production and distribution planning. Eur. J. Oper. Res. 177(1): 626-629 (2007) - [j7]Feng Chu, Chengbin Chu:
Polynomial Algorithms for Single-Item Lot-Sizing Models With Bounded Inventory and Backlogging or Outsourcing. IEEE Trans Autom. Sci. Eng. 4(2): 233-251 (2007) - [c7]Jianxiang Li, Feng Chu, Haoxun Chen:
Probabilistic analysis on three-level distribution systems. SMC 2007: 1729-1734 - [c6]Naiqi Wu, Feng Chu, Chengbin Chu, MengChu Zhou:
Schedulability analysis of short-term schedule for crude oil operations using Petri nets. SMC 2007: 3481-3486 - 2006
- [j6]Xiaochuan Luo, Feng Chu:
A branch and bound algorithm of the single machine schedule with sequence dependent setup times for minimizing total tardiness. Appl. Math. Comput. 183(1): 575-588 (2006) - [j5]Feng Chu, Nacima Labadi, Christian Prins:
A Scatter Search for the periodic capacitated arc routing problem. Eur. J. Oper. Res. 169(2): 586-605 (2006) - [c5]Naiqi Wu, Yanming Qian, MengChu Zhou, Feng Chu:
Issues on Short-Term Scheduling of Oil Refinery. SMC 2006: 2920-2925 - [c4]Jinhong Zhong, Feng Chu, Chengbin Chu, Shanling Yang:
Mixed Backlogging and Outsourcing Models with Inventory Capacity. SMC 2006: 4546-4551 - 2005
- [j4]Feng Chu, Nacima Labadi, Christian Prins:
Heuristics for the periodic capacitated arc routing problem. J. Intell. Manuf. 16(2): 243-251 (2005) - [j3]Haoxun Chen, Lionel Amodeo, Feng Chu, Karim Labadi:
Modeling and performance evaluation of supply chains using batch deterministic and stochastic Petri nets. IEEE Trans Autom. Sci. Eng. 2(2): 132-144 (2005) - [c3]Naiqi Wu, Yanming Qian, Feng Chu:
Readability of target refining schedule for oil refinery. SMC 2005: 2031-2036 - 2004
- [c2]Feng Chu, Chengbin Chu, Xiao Liu:
Lot sizing models with backlog or out-sourcing. SMC (5) 2004: 4342-4347 - 2002
- [j2]Ada Che, Chengbin Chu, Feng Chu:
Multicyclic hoist scheduling with constant processing times. IEEE Trans. Robotics Autom. 18(1): 69-80 (2002) - [c1]Haoxun Chen, Lionel Amodeo, Feng Chu:
Batch Deterministic and Stochastic Petri Nets: A Tool for Modeling and Performance Evaluation of Supply Chain. ICRA 2002: 78-83
1990 – 1999
- 1997
- [j1]Feng Chu, Xiaolan Xie:
Deadlock analysis of Petri nets using siphons and mathematical programming. IEEE Trans. Robotics Autom. 13(6): 793-804 (1997)
Coauthor Index
aka: Mengchu Zhou
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-10-07 22:15 CEST by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint