default search action
Mostafa Zandieh
Person information
- affiliation: Shahid Beheshti University, Department of Industrial Management, Tehran, Iran
Refine list
refinements active!
zoomed in on ?? of ?? records
view refined list in
export refined list as
2020 – today
- 2024
- [j75]Ehsan Khanmohammadi, Hossein Safari, Mostafa Zandieh, Behnam Malmir, Erfan Babaee Tirkolaee:
Development of Dynamic Balanced Scorecard Using Case-Based Reasoning Method and Adaptive Neuro-Fuzzy Inference System. IEEE Trans. Engineering Management 71: 899-912 (2024) - 2022
- [j74]Hamed Jafar-Zanjani, Mostafa Zandieh, Mani Sharifi:
Robust and resilient joint periodic maintenance planning and scheduling in a multi-factory network under uncertainty: A case study. Reliab. Eng. Syst. Saf. 217: 108113 (2022) - [j73]Farzaneh Nazarizadeh, Akbar Alemtabriz, Mostafa Zandieh, Abbas Raad:
An analytical model for reliability assessment of the rail system considering dependent failures (case study of Iranian railway). Reliab. Eng. Syst. Saf. 227: 108725 (2022) - 2021
- [j72]Mahnaz Sohrabi, Mostafa Zandieh, Behrouz Afshar-Nadjafi:
A simple empirical inventory model for managing the processed corneal tissue equitably in hospitals with demand differentiation. Comput. Appl. Math. 40(8) (2021) - [j71]Ehsan Razavian, Akbar Alem Tabriz, Mostafa Zandieh, Mohammad Reza Hamidizadeh:
An integrated material-financial risk-averse resilient supply chain model with a real-world application. Comput. Ind. Eng. 161: 107629 (2021) - [j70]Seyed Shamsodin Hosseini, Parham Azimi, Mani Sharifi, Mostafa Zandieh:
A new soft computing algorithm based on cloud theory for dynamic facility layout problem. RAIRO Oper. Res. 55(Supplement): S2433-S2453 (2021) - 2020
- [j69]Ashkan Ayough, Mostafa Zandieh, Farbod Farhadi:
Balancing, sequencing, and job rotation scheduling of a U-shaped lean cell with dynamic operator performance. Comput. Ind. Eng. 143: 106363 (2020) - [j68]Hany Seidgar, Hamed Fazlollahtabar, Mostafa Zandieh:
Scheduling two-stage assembly flow shop with random machines breakdowns: integrated new self-adapted differential evolutionary and simulation approach. Soft Comput. 24(11): 8377-8401 (2020)
2010 – 2019
- 2019
- [j67]Mostafa Zandieh:
Scheduling of Virtual Cellular Manufacturing Systems: A Biogeography-Based Optimization Algorithm. Appl. Artif. Intell. 33(7): 594-620 (2019) - [j66]Amir Nourmohammadi, Masood Fathi, Mostafa Zandieh, Morteza Ghobakhloo:
A Water-Flow Like Algorithm for Solving U-Shaped Assembly Line Balancing Problems. IEEE Access 7: 129824-129833 (2019) - [j65]Ehsan Yadegari, Akbar Alem-Tabriz, Mostafa Zandieh:
A memetic algorithm with a novel neighborhood search and modified solution representation for closed-loop supply chain network design. Comput. Ind. Eng. 128: 418-436 (2019) - [j64]Seyed Mojtaba Sajadi, Azar Alizadeh, Mostafa Zandieh, Fereshteh Tavan:
Robust and stable flexible job shop scheduling with random machine breakdowns: multi-objectives genetic algorithm approach. Int. J. Math. Oper. Res. 14(2): 268-289 (2019) - [j63]Mostafa Zandieh, Babak Aslani:
A hybrid MCDM approach for order distribution in a multiple-supplier supply chain: A case study. J. Ind. Inf. Integr. 16: 100104 (2019) - [j62]Reza Behmanesh, Mostafa Zandieh:
Surgical case scheduling problem with fuzzy surgery time: An advanced bi-objective ant system approach. Knowl. Based Syst. 186 (2019) - [j61]Seyed Mohsen Mousavi, Madjid Tavana, Najmeh Alikar, Mostafa Zandieh:
A tuned hybrid intelligent fruit fly optimization algorithm for fuzzy rule generation and classification. Neural Comput. Appl. 31(3): 873-885 (2019) - 2018
- [j60]Mehrzad Shahinmoghadam, Ahad Nazari, Mostafa Zandieh:
CA-FCM: Towards a formal representation of expert's causal judgements over construction project changes. Adv. Eng. Informatics 38: 620-638 (2018) - [j59]Seyyed Mostafa Mousavi, Iraj Mahdavi, Javad Rezaeian, Mostafa Zandieh:
An efficient bi-objective algorithm to solve re-entrant hybrid flow shop scheduling with learning effect and setup times. Oper. Res. 18(1): 123-158 (2018) - [j58]Mostafa Zandieh, Sima Motallebi:
Determination of production planning policies for different products in process industries: using discrete event simulation. Prod. Eng. 12(6): 737-746 (2018) - [j57]Mojtaba Hemmati, Maghsoud Amiri, Mostafa Zandieh:
Optimization redundancy allocation problem with nonexponential repairable components using simulation approach and artificial neural network. Qual. Reliab. Eng. Int. 34(3): 278-297 (2018) - 2017
- [j56]Mostafa Zandieh, A. R. Khatami, Seyed Habib A. Rahmati:
Flexible job shop scheduling under condition-based maintenance: Improved version of imperialist competitive algorithm. Appl. Soft Comput. 58: 449-464 (2017) - [j55]Hêris Golpîra, Esmaeil Najafi, Mostafa Zandieh, Soheil Sadi-Nezhad:
Robust bi-level optimization for green opportunistic supply chain network design problem against uncertainty and environmental risk. Comput. Ind. Eng. 107: 301-312 (2017) - [j54]Omid Amirtaheri, Mostafa Zandieh, Behrouz Dorri, A. R. Motameni:
A bi-level programming approach for production-distribution supply chain problem. Comput. Ind. Eng. 110: 527-537 (2017) - [j53]Seyed-Hadi Mirghaderi, Mostafa Zandieh:
Improving ABC algorithm using new search mechanisms. Int. J. Intell. Syst. Technol. Appl. 16(1): 14-31 (2017) - [j52]Mostafa Zandieh, E. Shokrollahpour, M. Bagher:
Maximum-weighted tree matching problem: a novel discrete invasive weed optimisation algorithm. Int. J. Intell. Syst. Technol. Appl. 16(2): 95-105 (2017) - [j51]Mostafa Zandieh, Seyed Mojtaba Sajadi, Reza Behnoud:
Integrated production scheduling and maintenance planning in a hybrid flow shop system: a multi-objective approach. Int. J. Syst. Assur. Eng. Manag. 8(2s): 1630-1642 (2017) - 2016
- [j50]Ehsan Ahmadi, Mostafa Zandieh, Mojtaba Farrokh, Seyed Mohammad Emami:
A multi objective optimization approach for flexible job shop scheduling problem under random machine breakdown by evolutionary algorithms. Comput. Oper. Res. 73: 56-66 (2016) - [j49]Ehsan Teymourian, Vahid Kayvanfar, G. M. Komaki, Mostafa Zandieh:
Enhanced intelligent water drops and cuckoo search algorithms for solving the capacitated vehicle routing problem. Inf. Sci. 334-335: 354-378 (2016) - [j48]Mostafa Zandieh, M. B. Abiri, Seyed Habib A. Rahmati:
Bi-objective scheduling of flexible flow lines: a gradual transition tabu search approach. Prod. Eng. 10(4-5): 477-488 (2016) - 2015
- [j47]Ehsan Yadegari, Mostafa Zandieh, Hesamaddin Najmi:
A hybrid spanning tree-based genetic/simulated annealing algorithm for a closed-loop logistics network design problem. Int. J. Appl. Decis. Sci. 8(4): 400-426 (2015) - 2014
- [j46]Vahid Kayvanfar, G. M. Komaki, Amin Aalaei, Mostafa Zandieh:
Minimizing total tardiness and earliness on unrelated parallel machines with controllable processing times. Comput. Oper. Res. 41: 31-43 (2014) - [j45]Ehsan Yadegari, Mostafa Ekhtiari, Mostafa Zandieh, Akbar Alem-Tabriz:
An Artificial Immune Algorithm for a Closed-Loop Supply Chain Network Design Problem with Different Delivery Paths. Int. J. Strateg. Decis. Sci. 5(3): 27-46 (2014) - [j44]B. Naderi, Mostafa Zandieh, Mehdi Yazdani:
Polynomial time approximation algorithms for proportionate open-shop scheduling. Int. Trans. Oper. Res. 21(6): 1031-1044 (2014) - 2013
- [j43]Mehdi Iranpoor, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Due-date assignment and machine scheduling in a low machine-rate situation with stochastic processing times. Comput. Oper. Res. 40(4): 1100-1108 (2013) - [j42]Vahid Khajehvand, Hossein Pedram, Mostafa Zandieh:
SCTTS: Scalable Cost-Time Trade-off Scheduling for Workflow Application in Grids. KSII Trans. Internet Inf. Syst. 7(12): 3096-3117 (2013) - [j41]Amir Nourmohammadi, Mostafa Zandieh, Reza Tavakkoli-Moghaddam:
An imperialist competitive algorithm for multi-objective U-type assembly line design. J. Comput. Sci. 4(5): 393-400 (2013) - 2012
- [j40]Hadi Mosadegh, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Simultaneous solving of balancing and sequencing problems with station-dependent assembly times for mixed-model assembly lines. Appl. Soft Comput. 12(4): 1359-1370 (2012) - [j39]R. Sakiani, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Multi-objective supply planning for two-level assembly systems with stochastic lead times. Comput. Oper. Res. 39(7): 1325-1332 (2012) - [j38]Javad Behnamian, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Hybrid flowshop scheduling with sequence-dependent setup times by hybridizing max-min ant system, simulated annealing and variable neighbourhood search. Expert Syst. J. Knowl. Eng. 29(2): 156-169 (2012) - [j37]Behnam Vahdani, Reza Tavakkoli-Moghaddam, Mostafa Zandieh, Jafar Razmi:
Vehicle routing scheduling using an enhanced hybrid optimization approach. J. Intell. Manuf. 23(3): 759-774 (2012) - [j36]Hamid Karimi, Seyed Habib A. Rahmati, Mostafa Zandieh:
An efficient knowledge-based algorithm for the flexible job shop scheduling problem. Knowl. Based Syst. 36: 236-244 (2012) - [c2]Vahid Khajehvand, Hossein Pedram, Mostafa Zandieh:
Provisioning-Based Resource Management for Effective Workflow Scheduling on Utility Grids. CCGRID 2012: 719-720 - 2011
- [j35]B. Naderi, Mostafa Zandieh, Majid Aminnayeri:
Incorporating periodic preventive maintenance into flexible flowshop scheduling problems. Appl. Soft Comput. 11(2): 2094-2101 (2011) - [j34]Alireza Boloori Arabani, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Multi-objective genetic-based algorithms for a cross-docking scheduling problem. Appl. Soft Comput. 11(8): 4954-4970 (2011) - [j33]R. Sakiani, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Corrigendum to: "Genetic algorithm for supply planning in two-level assembly systems with random lead times" [Engineering Applications of Artificial Intelligence 22 (2009) 906-915]. Eng. Appl. Artif. Intell. 24(5): 917-918 (2011) - [j32]Alireza Boloori Arabani, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage. Expert Syst. Appl. 38(3): 1964-1979 (2011) - [j31]E. Moradi, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem. Expert Syst. Appl. 38(6): 7169-7178 (2011) - [j30]H. Khorshidian, Nikbakhsh Javadian, Mostafa Zandieh, Javad Rezaeian, K. Rahmani:
A genetic algorithm for JIT single machine scheduling with preemption and machine idle time. Expert Syst. Appl. 38(7): 7911-7918 (2011) - [j29]Abbas Sadeghi, Mostafa Zandieh:
A game theory-based model for product portfolio management in a competitive market. Expert Syst. Appl. 38(7): 7919-7923 (2011) - [j28]H. Moslemi, Mostafa Zandieh:
Comparisons of some improving strategies on MOPSO for multi-objective (r, Q) inventory system. Expert Syst. Appl. 38(10): 12051-12057 (2011) - [j27]Saeid Fallah-Jamshidi, Neda Karimi, Mostafa Zandieh:
A hybrid multi-objective genetic algorithm for planning order release date in two-level assembly system with random lead times. Expert Syst. Appl. 38(11): 13549-13554 (2011) - [j26]Javad Behnamian, Mostafa Zandieh:
A discrete colonial competitive algorithm for hybrid flowshop scheduling to minimize earliness and quadratic tardiness penalties. Expert Syst. Appl. 38(12): 14490-14498 (2011) - [j25]B. Naderi, S. M. T. Fatemi Ghomi, Majid Aminnayeri, Mostafa Zandieh:
Scheduling open shops with parallel machines to minimize total completion time. J. Comput. Appl. Math. 235(5): 1275-1287 (2011) - [j24]H. S. Mirsanei, Mostafa Zandieh, Majid Javid Moayed, Mahmood Reza Khabbazi:
A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times. J. Intell. Manuf. 22(6): 965-978 (2011) - [j23]Mostafa Zandieh, Neda Karimi:
An adaptive multi-population genetic algorithm to solve the multi-objective group scheduling problem in hybrid flexible flowshop with sequence-dependent setup times. J. Intell. Manuf. 22(6): 979-989 (2011) - [j22]Javad Behnamian, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique. Soft Comput. 15(7): 1313-1331 (2011) - [c1]Javad Behnamian, Seyyed M. T. Fatemi Ghomi, Mostafa Zandieh:
Hybrid solving algorithm for complex machine scheduling problem. IEEM 2011: 794-798 - 2010
- [j21]E. Torabzadeh, Mostafa Zandieh:
Cloud theory-based simulated annealing approach for scheduling in the two-stage assembly flowshop. Adv. Eng. Softw. 41(10-11): 1238-1243 (2010) - [j20]Behnam Vahdani, Mostafa Zandieh:
Scheduling trucks in cross-docking systems: Robust meta-heuristics. Comput. Ind. Eng. 58(1): 12-24 (2010) - [j19]B. Naderi, S. M. T. Fatemi Ghomi, Majid Aminnayeri, Mostafa Zandieh:
A contribution and new heuristics for open shop scheduling. Comput. Oper. Res. 37(1): 213-221 (2010) - [j18]B. Naderi, Rubén Ruiz, Mostafa Zandieh:
Algorithms for a realistic variant of flowshop scheduling. Comput. Oper. Res. 37(2): 236-246 (2010) - [j17]Vahid Roshanaei, M. M. Seyyed Esfehani, Mostafa Zandieh:
Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics. Expert Syst. Appl. 37(1): 259-266 (2010) - [j16]Mohammad Amin Adibi, Mostafa Zandieh, Maghsoud Amiri:
Multi-objective scheduling of dynamic job shop using variable neighborhood search. Expert Syst. Appl. 37(1): 282-287 (2010) - [j15]Maghsoud Amiri, Mostafa Zandieh, Behnam Vahdani, R. Soltani, Vahid Roshanaei:
An integrated eigenvector-DEA-TOPSIS methodology for portfolio risk evaluation in the FOREX spot market. Expert Syst. Appl. 37(1): 509-516 (2010) - [j14]Mehdi Yazdani, Maghsoud Amiri, Mostafa Zandieh:
Flexible job-shop scheduling with parallel variable neighborhood search algorithm. Expert Syst. Appl. 37(1): 678-687 (2010) - [j13]Neda Karimi, Mostafa Zandieh, H. R. Karamooz:
Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach. Expert Syst. Appl. 37(6): 4024-4032 (2010) - [j12]R. Soltani, Fariborz Jolai, Mostafa Zandieh:
Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria. Expert Syst. Appl. 37(8): 5951-5959 (2010) - [j11]Ali Bagheri, Mostafa Zandieh, Iraj Mahdavi, Mehdi Yazdani:
An artificial immune algorithm for the flexible job-shop scheduling problem. Future Gener. Comput. Syst. 26(4): 533-541 (2010) - [j10]Mostafa Zandieh, E. Mozaffari, Mansour Gholami:
A robust genetic algorithm for scheduling realistic hybrid flexible flow line problems. J. Intell. Manuf. 21(6): 731-743 (2010)
2000 – 2009
- 2009
- [j9]F. Jabbarizadeh, Mostafa Zandieh, Davoud Talebi:
Hybrid flexible flowshops with sequence-dependent setup times and machine availability constraints. Comput. Ind. Eng. 57(3): 949-957 (2009) - [j8]B. Naderi, Mostafa Zandieh, M. A. H. A. Shirazi:
Modeling and scheduling a case of flexible flowshops: Total weighted tardiness minimization. Comput. Ind. Eng. 57(4): 1258-1267 (2009) - [j7]B. Naderi, Mostafa Zandieh, A. Khaleghi Ghoshe Balagh, Vahid Roshanaei:
An improved simulated annealing for hybrid flowshops with sequence-dependent setup and transportation times to minimize total completion time and total tardiness. Expert Syst. Appl. 36(6): 9625-9633 (2009) - [j6]Javad Behnamian, Mostafa Zandieh, S. M. T. Fatemi Ghomi:
Parallel-machine scheduling problems with sequence-dependent setup times using an ACO, SA and VNS hybrid algorithm. Expert Syst. Appl. 36(6): 9637-9644 (2009) - [j5]Javad Behnamian, S. M. T. Fatemi Ghomi, Mostafa Zandieh:
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic. Expert Syst. Appl. 36(8): 11057-11069 (2009) - [j4]Maghsoud Amiri, Mostafa Zandieh, R. Soltani, Behnam Vahdani:
A hybrid multi-criteria decision-making model for firms competence evaluation. Expert Syst. Appl. 36(10): 12314-12322 (2009) - [j3]Mansour Gholami, Mostafa Zandieh:
Integrating simulation and genetic algorithm to schedule a dynamic flexible job shop. J. Intell. Manuf. 20(4): 481-498 (2009) - [j2]Bahman Naderi, Mostafa Zandieh, Seyyed M. T. Fatemi Ghomi:
A study on integrating sequence dependent setup time flexible flow lines and preventive maintenance scheduling. J. Intell. Manuf. 20(6): 683-694 (2009) - 2006
- [j1]Mostafa Zandieh, S. M. T. Fatemi Ghomi, S. M. Moattar Husseini:
An immune algorithm approach to hybrid flow shops scheduling with sequence-dependent setup times. Appl. Math. Comput. 180(1): 111-127 (2006)
Coauthor Index
aka: S. M. T. Fatemi Ghomi
manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.
Unpaywalled article links
Add open access links from to the list of external document links (if available).
Privacy notice: By enabling the option above, your browser will contact the API of unpaywall.org to load hyperlinks to open access articles. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Unpaywall privacy policy.
Archived links via Wayback Machine
For web page which are no longer available, try to retrieve content from the of the Internet Archive (if available).
Privacy notice: By enabling the option above, your browser will contact the API of archive.org to check for archived content of web pages that are no longer available. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Internet Archive privacy policy.
Reference lists
Add a list of references from , , and to record detail pages.
load references from crossref.org and opencitations.net
Privacy notice: By enabling the option above, your browser will contact the APIs of crossref.org, opencitations.net, and semanticscholar.org to load article reference information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the Crossref privacy policy and the OpenCitations privacy policy, as well as the AI2 Privacy Policy covering Semantic Scholar.
Citation data
Add a list of citing articles from and to record detail pages.
load citations from opencitations.net
Privacy notice: By enabling the option above, your browser will contact the API of opencitations.net and semanticscholar.org to load citation information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the OpenCitations privacy policy as well as the AI2 Privacy Policy covering Semantic Scholar.
OpenAlex data
Load additional information about publications from .
Privacy notice: By enabling the option above, your browser will contact the API of openalex.org to load additional information. Although we do not have any reason to believe that your call will be tracked, we do not have any control over how the remote server uses your data. So please proceed with care and consider checking the information given by OpenAlex.
last updated on 2024-10-07 22:13 CEST by the dblp team
all metadata released as open data under CC0 1.0 license
see also: Terms of Use | Privacy Policy | Imprint