


default search action
"Delay-Based Maximum Power-Weight Scheduling With Heavy-Tailed Traffic."
Shih-Chun Lin et al. (2017)
- Shih-Chun Lin
, Pu Wang
, Ian F. Akyildiz, Min Luo:
Delay-Based Maximum Power-Weight Scheduling With Heavy-Tailed Traffic. IEEE/ACM Trans. Netw. 25(4): 2540-2555 (2017)

manage site settings
To protect your privacy, all features that rely on external API calls from your browser are turned off by default. You need to opt-in for them to become active. All settings here will be stored as cookies with your web browser. For more information see our F.A.Q.