"A note on two-stage hybrid flowshop scheduling with missing operations."

Chao-Tang Tseng, Ching-Jong Liao, Tai-Xiang Liao (2008)

Details and statistics

DOI: 10.1016/J.CIE.2007.09.005

access: closed

type: Journal Article

metadata version: 2020-02-20