"Multiobjective lot scheduling and dynamic OHT routing in a 300-mm wafer fab."

Jia-Wei Yang et al. (2008)

Details and statistics

DOI: 10.1109/ICSMC.2008.4811517

access: closed

type: Conference or Workshop Paper

metadata version: 2017-06-15