"Minimizing average coflow completion time with decentralized scheduling."

Shouxi Luo et al. (2015)

Details and statistics

DOI: 10.1109/ICC.2015.7248339

access: closed

type: Conference or Workshop Paper

metadata version: 2023-01-30