"The S-curve envelope as a tool for monitoring and control of projects."

José Ramón San Cristóbal (2017)

Details and statistics

DOI: 10.1016/J.PROCS.2017.11.097

access: closed

type: Conference or Workshop Paper

metadata version: 2022-04-15